Home
About Us
Acoustic Testing
Acoustic Services
Downloads
Contact Us



4340
Accredited to ISO/IEC
17025:2005
UKAS Accredited Company
Registered in England & Wales No. 527550
|
Sound
Testing or Robust Details
The Air Pressure Testing Team are regularly being asked how
best to comply with the Building Regulations Approved Document
E; and whether it is more cost-efficient to opt for pre-completion
testing or to go down the Robust Details route.
To try and clarify matters we have undertaken a brief overview
that we hope will help answer some of the questions you and
your colleagues may have. If you do have any projects that
you are not sure of the best course of action please contact
Air Pressure Testing and we would be happy to advise you.
We specialise in helping small developers attain Part E compliance
by offering design advice for all new build and conversation
projects. We offer a very one on one approach with the client
unlike some of the larger acoustic consultancies where you
can wait weeks just for feedback on small design detailing,
which can be cause major delays to your build programme.
Complying with Building Regulations Approved Document
E - Pre-completion testing or Robust Details?
Essentially there are two possible routes to satisfying the
requirements of Approved Document E (ADE) for new build residential
dwellings. These are either commission Pre-Completion Testing
(PCT) of a sample of separating walls and floors between dwellings
in your development by a suitably qualified acoustic consultant,
or you can register and build the dwellings in your development
in accordance with your preferred Robust Details (RD) construction
types.
We all know that Robust Details is a good scheme that attains
high levels of compliance with ADE. However, there are some
limitations:
Robust Details (RD)
Can only be used for new build dwellings in England &
Wales – they don’t apply to refurbishment or conversion
projects, so these must be tested.
Limited flexibility, as separating walls and floors must be
built ‘strictly in accordance’ with the details
in the RD Handbook
Not all RD walls and floors qualify for Code for Sustainable
Homes (CSH) credits
The construction can work out very expensive
Pre-Completion Testing (PCT)
Can be undertaken on any dwelling, either new build or conversion,
to demonstrate compliance with ADE
Complete flexibility in cost effective design of separating
walls and floors (of course, we strongly advise that Air Pressure
Testing are brought in at an early stage to advise on the
acoustic aspects of the design)
As well as showing compliance with ADE, the test results can
also be used for increased award of CSH credits.
If you would like any more information on the above or if
you have any questions, need help, advice or a quotation please
do not hesitate to contact me by e-mail at darren@airpressuretesting.net
or call 0777 562 3464 as always we are always happy to help.
Sound Testing - Further Information
For further information on Acoustic Testing please visit the
'acoustic
testing page'.
Thermographic Surveys - Further Information
For further information on thermographic surveys please visit
the 'thermographic
surveys page'.
If you have any questions or queries please
don’t hesitate to contact us:
By Mobile - 07967 233836 (available 7am to 10pm)
By Fax - 01582 896 709
By E-mail - info@airpressuretesting.net
ACOUSTIC TESTING SERVICES
|
|